INDUSTRIAL PROJECTS



Miller Waste

London, ON

Date Started:

April 2012


Date Completed:

October 2012


Size:

120,000 sq. ft.

180’ clear span


Construction Type:

Pre-Engineered Steel


Manufacturer:

American Buildings Company


Details:

Waste Transfer Facility with Large Clear Span Frame

Click image to enlarge


Precision Drilling

Fort St. John, BC

Date Started:

October 2007


Date Completed:

February 2008


Size:

20,000 sq. ft.


Construction Type:

Pre-Engineered Steel


Manufacturer:

Butler Manufacturing


Details:

Pre-Engineered Steel Office and Shops


Aviation Unlimited

Oshawa, ON

Date Started:

August 2014


Date Completed:

December 2014


Size:

20000 sq. ft.


Construction Type:

Pre-Engineered Steel


Manufacturer:

Varco Pruden


Details:

Hangar for Personal Aircraft

Click image to enlarge


Firebag 3&4

Fort McMurray, AB

Date Started:

April 2008


Date Completed:

September 2011


Size:

80,000 sq. ft.


Construction Type:

Pre-Engineered Steel


Manufacturer:

Behlen Industries


Details:

2 Identical Side by Side Co-Generation Water Treatment Plant for SAGD Application

Click image to enlarge


Misery Mine

310km N.E. of Yellowknife, NWT

Date Started:

August 2011


Date Completed:

May 2012


Size:


Construction Type:

Fold-A-Way


Manufacturer:

Atco/WF Welding


Details:

3 Buildings

Click image to enlarge


Schlumberger

Red Deer, AB

Date Started:

October 2012


Date Completed:

May 2013


Size:

150,000


Construction Type:

Pre-Engineered Steel


Manufacturer:

Butler Manufacturing


Details:

Warehouse with Attached Office and Separate Bulk Storage Building

Click image to enlarge


Statoil

Conklin, AB

Date Started:

April 2014


Date Completed:

December 2014


Size:

30,000 sq. ft.


Construction Type:

Hybrid Conventional Pre-Engineered


Manufacturer:

Exsteel


Details:

Consisted of 3 buildings Conventional Steel with Cold Rolled Secondary Girts, Purlins and Cladding

Click image to enlarge


Taylor Steel

Stoney Creek, ON

Date Started:

June 2002


Date Completed:

June 2003


Size:

400,000 sq. ft.


Construction Type:

Pre-Engineered Steel


Manufacturer:

Steelway Building Systems


Details:

Largest Coil Storage Facility in  Steel City (Hamilton, ON)

Click image to enlarge


Precision Drilling

Red Deer, AB

Date Started:

May 2004


Date Completed:

October 2004


Size:

30,000 sq. ft.


Construction Type:

Pre-Engineered Steel


Manufacturer:

Butler Manufacturing


Details:

Maintenance Facility


Nelson Steel

Naticoke, ON & Stoney Creek, ON

Date Started:

May 1998


Date Completed:

December 1998


Size:

180,000 sq. ft.


Construction Type:

Pre-Engineered Steel


Manufacturer:

Butler Manufacturing


Details:

2 Identical Buildings; One Located in Nanticoke and One Located in Stoney Creek


BC Hydro

Cranbrook, BC

Date Started:

April 2004


Date Completed:

September 2004


Size:


Construction Type:

Pre-Engineered Steel


Manufacturer:

Behlen Industries


Details:

Water Turbine Power Building

Click image to enlarge