INDUSTRIAL PROJECTS



Imperial Metals Red Chris Project

Dease Lake, BC

Date Started:

October 2012


Date Completed:

December2014


Size:

120,000 sq. ft.


Construction Type: 

Hybrid Pre-Engineered


Manufacturer:

Behlen Industries


Details:

Gold mine crusher building, floatation and storage

Click on the image to enlarge


Potash Corporation of Saskatchewan

Rocanville, SK

Date Started:

January 2015


Date Completed:

In Progress


Size:


Construction Type:


Manufacturer:

Burnco Manufacturing


Details:

Demolition of Existing Headframe and Collar; Mod Erection


Fort Hills Suncor

Fort McMurray, AB

Date Started:

May 2015


Date Completed:

October 2015


Size:

80,000 sq. ft.


Construction Type: Conventional


Manufacturer:


Details:

Modular Assembly and Erection

Click on image to enlarge


Perras

Fort McMurray, AB

Date Started:

September 2014


Date Completed:

March 2015


Size:

120,000


Construction Type:

Pre-Engineered Steel


Manufacturer:

Butler


Details:

4 Separate Buildings Comprising of Pre-Engineered Metal Clad and Stand and Seam Roof

Click the image to enlarge


Mosaic Potash Barn

Esterhazy, SK

Date Started:

November 2012


Date Completed:

August 2013


Size:

200’ Clear Span

100’ Eave and peak

130,000


Construction Type:

Pre-Engineered Steel


Manufacturer:

Behlen Industries


Details:

Supply and Erect

Pre-Engineered and Conventional

Click the image to enlarge


Sifto Canada Corp.

Goderich, ON

Date Started:

August 2011


Date Completed:

February 2012


Size: 


Construction Type:


Conventional and Steel Cladding System


Manufacturer:

Agway Metals Inc.


Details:

Reconstruction of Plant After Tornado


Powerline Plus

Toronto, ON

Date Started:

October 2015


Date Completed:

February 2016


Size:

30,000 sq. ft.


Construction Type:

Pre-Engineered Steel


Manufacturer:

Varco Pruden


Details:

Click image to enlarge


Nusco Manufacturing

Bonnyville, AB

Date Started:

September 2006


Date Completed:

August 2008


Size:

80,000 sq. ft.

60’ Eave


Construction Type:

Pre-Engineered Steel


Manufacturer:

Butler


Details:

Fabricate, Sandblasting and Paint Assembly Building for Oil Drilling Equipment


West Fraser Saw Mill

Quesnel, BC

Date Started:

April 2005


Date Completed:

April 2006


Size:

225,000 sq. ft.

70’ Eave


Construction Type:

Hybrid Pre-Engineered


Manufacturer:

Behlen Industries


Details:

Multi-leveled Pre-Engineered Building Erected over top of a Conventional Operating Floor


Arvin Sango

London, ON

Date Started:

April 2013


Date Completed:

October 2013


Size:

160,000 sq. ft.


Construction Type:

Hybrid Pre-Engineered


Manufacturer:

Varco Pruden


Details:

Pre-Engineered Steel Rigid Frame with Truss Purlins

Click image to enlarge


IPSCO Rod Mill

Regina, SK

Date Started:

May 2006


Date Completed:

December 2006


Size:

60,000 sq. ft.

60’ Eave

40 ton overhead crane


Construction Type:

Pre-Engineered Steel


Manufacturer:

Behlen Industries


Details:

Including 35,000 sq. ft. Butler Fast Roof over Existing Plant

Click image to enlarge


MORE SSE INDUSTRIAL PROJECTS


Miller Waste - London, ON

120,000 sq. ft., 180’ clear span. Waste Transfer Facility with Large Clear Span Frame.

Aviation Unlimited - Oshawa, ON

20000 sq. ft. Pre-Engineered Steel Hangar for Personal Aircraft.

Precision Drilling - Fort St. John, BC

20,000 sq. ft., Pre-Engineered Steel Office and Shops by Butler Manufacturing



Firebag 3 & 4 - Fort McMurray, AB

80,000 sq. ft. Pre-Engineered Steel.

2 Identical Side by Side Co-Generation Water Treatment Plant for SAGD Application.